Boot Sequence/de

From meteobridge
Revision as of 23:51, 25 February 2013 by Admin (Talk | contribs) (Created page with "Start-Sequenz")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

<languages />
On power-on Meteobridge device runs through a couple of different phases where you can interact by pressing the button on top of the unit (TL-MR3020 or TL-WR703N) or at the back behind a pin hole (WL-330N3G). Picture below tries to illustrate what these phases are, how to recognize them and what options you have being there.

Operational-flow-chart.png